Case study · MarLuc synopsis

NATS AI runway monitoring trial at Heathrow

E

Implemented 2019–2023 · Transport and logistics · UK · 2 min read · Version 1.0

NATS has trialled an AI camera system at Heathrow since 2019 to tell controllers when a landed aircraft has left the runway in low cloud, aiming to recover lost landing capacity. It was still described as a trial in 2023, and no operational results are published.

At a glance

No measurable effect: no results reported.

AI used
Computer vision and machine learning platform (Searidge Aimee) tracking aircraft from airfield cameras
Implemented
2019–2023
Grade
Band E · No measurable effect · Claimed only
Headline result, as reported
Trial to recover landing capacity lost in low cloud began in 2019 with a goal of service that year; still described as a trial in October 2023

1The case

The facts, as reported by the sources below. Where a source is silent, the field says “Not reported”.

Organisation

NATS. UK air traffic control provider, handling over 2.5 million flights and 300 million passengers a year over the UK and the North Atlantic. Heathrow's 87-metre control tower is the tallest in the UK.

Canvas block: 4. Operations and process. Also 6. Data and technology, 8. Governance and risk

Business challenge

The challengeHeathrow's control tower can disappear into low cloud while the runways below are clear. Controllers then rely on radar to know an aircraft has left the runway and leave extra time between landings, which loses 20% of landing capacity and causes delays, per NATS.

How it was addressedIn January 2019 NATS began non-operational trials in its £2.5m digital tower laboratory inside the Heathrow control tower. Twenty ultra HD cameras feed Aimee, an AI platform from Canada's Searidge Technologies, which tracks aircraft and tells the controller when one has cleared the runway; the controller decides whether to clear the next arrival. Aimee was to study more than 50,000 arrivals, with findings to go to the Civil Aviation Authority, and NATS said the technology could enter service as early as 2019. By January 2020 NATS, Searidge and the CAA had set up an innovation team to develop a regulatory framework and validate the initial test results, per Eurocontrol. In October 2023 a Searidge article in NATS's own publication still described Aimee as being trialled at Heathrow. [1][2][3][4][5]

Who implemented it

  • Searidge TechnologiesSoftware vendorDeveloped the Aimee AI platform; its engineers worked alongside controllers in the laboratory
  • In-houseIn-houseNATS: built and runs the digital tower laboratory at Heathrow

Technology (SEAM pillar E)

T8 Predictive / ML models
  1. T1
  2. T2
  3. T3
  4. T4
  5. T5
  6. T6
  7. T7
  8. T8
  9. T9
Deployment
Not reported
Vendors and products
Searidge Technologies, Aimee
Where it was built in
Twenty ultra HD 4K cameras around the airfield feed Aimee, which combines images with radar and multilateration tracking and prompts controllers on a video wall in the digital tower laboratory. [1][4]

Technology types follow the SEAM taxonomy, the same list the SEAM Check uses.

What changed

Before: in low cloud, controllers rely on radar and space landings further apart. After, in the laboratory: controllers see camera images with AI prompts when aircraft clear the runway. Change in live operations: Not reported. [1][2][3][4][5]

What it cost

£2.5m invested by NATS in the digital tower laboratory. Cost of the AI trial itself: Not reported.

What it saved

Not reported. NATS said in 2019 it believed the system would help reclaim all the lost capacity; Eurocontrol in 2020 said it could help reclaim up to 20% of lost capacity. [1][2][3][4][5]

Governance and control

Controllers remain the decision makers, NATS says; the AI informs and the controller clears the next arrival. Trial findings were to go to the Civil Aviation Authority, and an innovation team with the CAA was set up to develop a regulatory framework and validate results. Outcome of validation: Not reported.

  • Accountable owner: Not reported
  • Safe use: Not reported
  • Human in the loop: Claimed
  • Monitoring and assurance: Claimed
  • Vendor AI: Not reported
  • Agent controls: Not reported
  • Standards and regulation: Claimed

Controls on each card:EvidencedOutside scrutinyClaimedMissingNot reported

Governance evidence by SEAM point
SEAM pointEvidenceWhat was done and how it was applied
S2 · Accountable owner○ Not reportedNot reported.
A1 · Safe use○ Not reportedNot reported.
A2 · Human in the loop◐ ClaimedThe AI informs the controller when the runway is clear; the controller decides whether to clear the next arrival, and NATS says controllers remain the decision makers. [1][4]
A3 · Monitoring and assurance◐ ClaimedAimee was to study more than 50,000 arrivals to check accuracy, with findings to go to the Civil Aviation Authority; results not reported. [1][2]
A4 · Vendor AI○ Not reportedNot reported.
A5 · Agent controls○ Not reportedNo agents described.
A6 · Standards and regulation◐ ClaimedNATS, Searidge and the CAA set up an innovation team to develop a regulatory framework and validate initial results, per Eurocontrol; no CAA decision reported. [4]

● Evidenced: shown by an independent source. ◐ Claimed: the organisation's own account. ✕ Missing: an independent source shows the control was absent. ○ Not reported: the sources are silent.

What worked, what did not, what is unproven

Worked

  • Controllers' reaction to the laboratory was enthusiastic, by NATS's account.
  • NATS said validation was showing the AI model performs equally well by day and night.

Did not

  • The aim to bring the technology into service as early as 2019 is not reported as met; in October 2023 it was still described as a trial.

Unproven

  • Accuracy over the 50,000-arrival study.
  • Any regulatory approval for operational use.
  • Capacity actually recovered on low-cloud days.

Timeline

  1. Jan 2019NATS begins non-operational trials of the Aimee AI platform in its Heathrow digital tower laboratory[1]
  2. Jan 2020Eurocontrol reports an innovation team with the CAA to develop a regulatory framework and validate initial results[4]
  3. Oct 2023Searidge article in NATS's own publication still describes Aimee as being trialled at Heathrow[5]

2Grade and SEAM assessment

MarLuc's opinion, made on the evidence above. How we grade cases

Level of change and impact

  1. ATransformational
  2. BOperating model redesign
  3. CProcess change
  4. DTask support
  5. ENo measurable effectGraded · Claimed only
  6. FFailure
Claimed
Not applicable
Grade
E · No measurable effect
Proof
Claimed only
Level of change
Not graded

No level assessed: band E, no results reported. A long-running trial with a stated capacity aim; no operational results published.

Controls against the SEAM minimum

Meets the SEAM minimum on the organisation's own account; no independent source shows the controls working. For T8 Predictive / ML models, the SEAM minimum is monitoring; the sources report human gates.

The controller decides whether to clear the next arrival; the trial was non-operational, with findings to go to the Civil Aviation Authority.

The SEAM view and lessons learnt

NATS kept controllers as decision makers and brought the regulator in early. The trial has run since 2019 without published results or a reported approval. For a larger organisation, the transferable point is to plan the assurance path and its timeline at the start, and to publish trial results so progress can be judged.

  1. Plan the regulatory assurance path before the trial starts.
  2. Keep the human decision point explicit in safety-critical uses.
  3. Publish trial results and decisions so progress can be judged.

Evidence

Score 1 of 4. Self-reported: NATS statements, a Eurocontrol article drawing on NATS, and a supplier article; no published trial results.

Evaluation method. Self-reported: non-operational trial in a laboratory; no results published in sources opened.

Sources disagree. NATS said in 2019 the system would help reclaim all the lost capacity; Eurocontrol in 2020 said up to 20% of lost capacity, and the 2023 Searidge article an extra 20% landing capacity on low visibility days.

Status. Unclear: described as a trial at Heathrow in October 2023; no operational use or regulatory approval reported in sources opened.

3Original sources

This synopsis draws on 5 sources, summarised by MarLuc. Read them in full before relying on any figure. If you think we have a fact or a grade wrong, challenge it and we will check and reply.

Version 1.0 · Published 16 Nov 2026 · Updated 16 Nov 2026 · Facts checked against sources 16 Nov 2026

Version history
  1. v1.016 Nov 2026First published

Found this useful? Share it with your network.

Know an AI deployment we should grade? Submit a case study

Where does your organisation sit?

The free SEAM Check takes ten minutes and shows where AI value is leaking. The free SEAM Report then gives your leadership team the full picture.