Case study · MarLuc synopsis

NASA Goddard evolved structures

C

Implemented 2022–2025 · Government and public services · US · 4 min read · Version 1.0

A NASA Goddard engineer uses commercial generative design software to produce one-off spacecraft and instrument structures that NASA calls evolved structures. NASA's own tests found the parts stiffer and stronger than human designs, and its 2025 presentation says the EXCITE balloon telescope, which uses a generatively designed part, flew an engineering flight in August 2024.

At a glance

Frontier case. AI used for a scientific, medical or engineering breakthrough. The transformation is potential and unproven; we grade what has changed in practice so far. How we grade frontier cases

AI and automation used
Commercial generative design software (Autodesk Fusion 360 Generative Design Extension) that NASA describes as AI; the underlying method is structural optimisation
Implemented
2022–2025
Grade
Band C · Process change · Claimed only
Headline result, as reported
NASA Goddard says AI generative design cut an instrument bracket's design effort from two days for two engineers to about 1.5 hours, with the part stiffer and stronger in tests

1The case

The facts, as reported by the sources below. Where a source is silent, the field says “Not reported”.

Organisation

NASA Goddard Space Flight Center. US space agency centre in Greenbelt, Maryland. The work was led by one research engineer and funded by Goddard's internal research programme and NASA's Space Technology Mission Directorate. Headcount: Not reported.

Canvas block: 4. Operations and process. Also 6. Data and technology

Business challenge

The challengeBy NASA's account, spaceflight instruments are expensive and NASA makes thousands of bespoke parts every year, so design, analysis and fabrication of each part is slow when done by separate people or organisations.

How it was addressedGoddard research engineer Ryan McClelland developed a process using commercially available AI software, which he calls evolved structures. A CAD specialist defines the mounting surfaces, bolts and no-go zones, and the software generates a structure in as little as an hour or two; parts are then analysed with NASA-standard validation software and processes and made by commercial vendors. The paper names Autodesk Fusion 360 Generative Design Extension as the tool. NASA says the parts have been adopted by missions including astrophysics balloon observatories, Earth-atmosphere scanners, planetary instruments, space weather monitors, space telescopes and Mars Sample Return. [1][2][3][4]

Who implemented it

  • In-houseIn-houseNASA Goddard Space Flight Center: Developed and applies the evolved structures process
  • AutodeskSoftware vendorSupplies the Fusion 360 generative design software named in NASA's paper

Parts are machined or printed by commercial vendors, which the sources do not name.

Technology (SEAM pillar E)

T2 Embedded AI in existing software
  1. T1
  2. T2
  3. T3
  4. T4
  5. T5
  6. T6
  7. T7
  8. T8
  9. T9
Deployment
Not reported
Vendors and products
Autodesk, Fusion 360 Generative Design Extension
Where it was built in
Used inside the CAD and analysis workflow: requirements and no-go zones go in, manufacturable designs come out, then standard finite element analysis, load and vibration testing and machining or printing by commercial vendors. [1][2]

Technology types follow the SEAM taxonomy, the same list the SEAM Check uses.

What changed

Before: a design engineer and structural analyst iterated on a part over days. After: one engineer encodes requirements and the software generates manufacturable options, and the part is checked with standard analysis, load tests and vibration tests. A human reviews the output, because by McClelland's account the algorithm can make structures too thin. [1][2][3][4]

What it cost

Not reported

What it saved

By NASA's account: parts that save up to two-thirds of the weight of traditional components; a prototype in hand in as little as one week; for the EXCITE tip/tilt bracket, about 1.5 hours of effort against two days of effort by two engineers. Dollar savings: Not reported. [1][2][3][4]

Governance and control

Parts are analysed with NASA-standard validation software and processes, and a human reviews the algorithm's output, by NASA's account. The paper reports load and vibration tests on fabricated brackets. Named risk owner and independent review: Not reported.

  • Accountable owner: Not reported
  • Safe use: Not reported
  • Human in the loop: Claimed
  • Monitoring and assurance: Claimed
  • Vendor AI: Claimed
  • Agent controls: Not reported
  • Standards and regulation: Not reported

Controls on each card:EvidencedOutside scrutinyClaimedMissingNot reported

Governance evidence by SEAM point
SEAM pointEvidenceWhat was done and how it was applied
S2 · Accountable owner○ Not reportedNot reported; the work was led by one named research engineer. [1]
A1 · Safe use○ Not reportedNot reported.
A2 · Human in the loop◐ ClaimedBy McClelland's account the algorithm needs a human eye because it can make structures too thin. [1]
A3 · Monitoring and assurance◐ ClaimedNASA says parts are analysed with NASA-standard validation software and processes; its paper reports load and vibration tests on fabricated brackets. [1][2]
A4 · Vendor AI◐ ClaimedThe paper names Autodesk Fusion 360 Generative Design Extension as the tool; vendor assurance is not reported. [2]
A5 · Agent controls○ Not reportedNo agents described.
A6 · Standards and regulation○ Not reportedNot reported.

● Evidenced: shown by an independent source. ◐ Claimed: the organisation's own account. ✕ Missing: an independent source shows the control was absent. ○ Not reported: the sources are silent.

What worked, what did not, what is unproven

Worked

  • In NASA's tests of the EXCITE tip/tilt bracket, the AI designs were stiffer per unit mass (740 and 885 Hz/kg against 240 Hz/kg) and had 7 and 9 times lower maximum stress than the third human design.
  • NASA's paper reports that tested parts were stronger than predicted and that standard analysis predicted structural performance accurately.
  • NASA's 2025 presentation says EXCITE flew an engineering flight in August 2024 and describes its receiver as coupled to the telescope by a generatively designed transfer box.

Did not

  • NASA's 2023 release said EXCITE planned a test flight as early as fall 2023; the engineering flight took place in August 2024.
  • By McClelland's account, left alone the algorithm can make structures too thin, so a human review stays in the process.

Unproven

  • Which specific evolved parts have flown: the sources say EXCITE flew and uses a generatively designed part, but do not list flown evolved parts.
  • Performance of evolved structures on Mars Sample Return and the other named missions, which NASA described as in design or construction in 2023: Not reported.
  • Use on larger structures: the paper says only small to mid-sized metal parts (0.6 m maximum) have been demonstrated.
  • Whether the method changes how spacecraft are designed across NASA: potential and unproven.

Timeline

  1. 2022SPIE paper reports the EXCITE bracket comparison and tests, and 20 other applications[2]
  2. Feb 2023NASA announces evolved structures adopted by several missions in design and construction[1]
  3. Aug 2024EXCITE flies an engineering flight[3]
  4. 2025EXCITE payload refurbished; 2026 to 2027 Antarctic science flight planned[3]

2Grade and SEAM assessment

MarLuc's opinion, made on the evidence above. How we grade cases

Level of change and impact

  1. ATransformationalClaimed
  2. BOperating model redesign
  3. CProcess changeGraded · Claimed only
  4. DTask support
  5. ENo measurable effect
  6. FFailure
Claimed
A
Grade
C · Process change
Proof
Claimed only
Level of change
Process change

Process change (Level 2, band C) in instrument structure design at Goddard. Claimed as a paradigm shift (band A); that is potential and unproven.

A changed design process: one engineer defines requirements and the software generates parts that commercial vendors can machine or print, and the method has been used on about 20 further Goddard applications. That is a process change (band C, level 2). NASA's results come from its own tests and papers. NASA describes a wider transformation of spacecraft design, calling it a "paradigm shift" and "game-changing"; it is potential and unproven, since the sources describe small to mid-sized metal parts and no independent review.

Controls against the SEAM minimum

Meets the SEAM minimum on the organisation's own account; no independent source shows the controls working. For T2 Embedded AI in existing software, the SEAM minimum is policy; the sources report human gates.

A human reviews generated shapes, and parts go through NASA-standard validation software and tests.

The SEAM view and lessons learnt

The gain is specific: a defined part, a defined tool, repeat tests and a flown instrument. The sources are NASA's own, and the method is structural optimisation sold as generative design, so the case is marked as partly AI. The useful practice is the control around it: the same validation software and tests as any other part, plus a human reviewer.

  1. Run AI-generated parts through the same analysis and tests as any other part.
  2. Keep a human reviewer on generated designs.
  3. Record which parts actually flew, not only which were designed.

Evidence

Score 2 of 4. Self-reported: NASA's own paper, release and presentation, with physical tests reported; relayed by press; no independent evaluation found.

Evaluation method. Agency paper and release with reported load and vibration tests; relayed by trade press; no independent evaluation or peer-reviewed trial found.

Sources disagree. NASA's release says the parts save up to two-thirds of the weight; the 2022 paper reports stiffness-to-mass and stress gains for one bracket and does not give a weight saving. The release said EXCITE would fly as early as fall 2023; the 2025 presentation says it flew in August 2024.

Status. Ongoing: EXCITE was preparing a 2026 to 2027 Antarctic science flight, per NASA's 2025 presentation.

3Original sources

This synopsis draws on 4 sources, summarised by MarLuc. Read them in full before relying on any figure. If you think we have a fact or a grade wrong, challenge it and we will check and reply.

Version 1.0 · Published 15 Nov 2026 · Updated 15 Nov 2026 · Facts checked against sources 15 Nov 2026

Version history
  1. v1.015 Nov 2026First published

Found this useful? Share it with your network.

Know an AI deployment we should grade? Submit a case study

Where does your organisation sit?

The free SEAM Check takes ten minutes and shows where AI value is leaking. The free SEAM Report then gives your leadership team the full picture.